An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations

Lucio Bianco and Massimiliano Caramia

European Journal of Operational Research, 2012, vol. 219, issue 1, 73-85

Abstract: In this paper we propose an exact algorithm for the Resource Constrained Project Scheduling Problem (RCPSP) with generalized precedence relationships (GPRs) and minimum makespan objective. For the RCPSP with GPRs we give a new mathematical formulation and a branch and bound algorithm exploiting such a formulation. The exact algorithm takes advantage also of a lower bound based on a Lagrangian relaxation of the same mathematical formulation. We provide an extensive experimentation and a comparison with known lower bounds and competing exact algorithms drawn from the state of the art.

Keywords: Branch and bound; Generalized precedence relationships; Lagrangian relaxation (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (9)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221711010964
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:219:y:2012:i:1:p:73-85

DOI: 10.1016/j.ejor.2011.12.019

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:219:y:2012:i:1:p:73-85