EconPapers    
Economics at your fingertips  
 

Models for MMSP-W considering workstation dependencies: A case study of Nissan’s Barcelona plant

Joaquín Bautista, Alberto Cano and Rocío Alfaro

European Journal of Operational Research, 2012, vol. 223, issue 3, 669-679

Abstract: In this article, we present two formulations and their unification for the Mixed-Model Sequencing Problem with Workload Minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The models were executed in Solver CPLEX, with reference instances and with a case study of Nissan’s Powertrain plant in Barcelona. Different situations were analysed to evaluate investments in projects designed to improve process and product design and reduce work overloads in the line at short-, intermediate- and long-term intervals.

Keywords: Manufacturing; Sequencing; Work overload; Linear programming; Mixed-model system (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221712005279
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:223:y:2012:i:3:p:669-679

DOI: 10.1016/j.ejor.2012.07.006

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:223:y:2012:i:3:p:669-679