EconPapers    
Economics at your fingertips  
 

A lot-sizing and scheduling model for multi-stage flow lines with zero lead times

Hartmut Stadtler and Florian Sahling

European Journal of Operational Research, 2013, vol. 225, issue 3, 404-419

Abstract: We present a new model formulation for lot-sizing and scheduling of multi-stage flow lines which works without a fixed lead-time offset and still guarantees a feasible material flow. In the literature, multi-stage lot-sizing model formulations often use a fixed lead time offset of one period leading to increased planned lead times. Computational tests have shown that the total costs resulting from our new model formulation are at least 10% lower. Furthermore, we present a solution approach based on Fix-and-Relax and Fix-and-Optimize. Numerical results show that this solution approach generates high-quality solutions in moderate computational time.

Keywords: Lot-sizing; Scheduling; Zero lead time offset; Fix-and-Optimize (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (9)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221712007382
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:225:y:2013:i:3:p:404-419

DOI: 10.1016/j.ejor.2012.10.011

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:225:y:2013:i:3:p:404-419