Due-window assignment with identical jobs on parallel uniform machines
Enrique Gerstl and
Gur Mosheiov
European Journal of Operational Research, 2013, vol. 229, issue 1, 41-47
Abstract:
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is studied. We focus on the setting of both (i) job-dependent earliness/tardiness job weights and (ii) parallel uniform machines. The objective is to find the job allocation to the machines and the job schedule, such that the total weighted earliness and tardiness cost is minimized. We study both cases of a non-restrictive (i.e. sufficiently late), and a restrictive due-window. For a given number of machines, the solutions of the problems studied here are obtained in polynomial time in the number of jobs.
Keywords: Scheduling; Parallel uniform machines; Earliness–tardiness; Assignment problem; Due-window (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221713000490
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:229:y:2013:i:1:p:41-47
DOI: 10.1016/j.ejor.2012.12.034
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().