Scheduling with few changes
Torsten Mütze
European Journal of Operational Research, 2014, vol. 236, issue 1, 37-50
Abstract:
In this work we consider scheduling problems where a sequence of assignments from products to machines – or from tasks to operators, or from workers to resources – has to be determined, with the goal of minimizing the costs (=money, manpower, and/or time) that are incurred by the interplay between those assignments. To account for the different practical requirements (e.g. few changes between different products/tasks on the same machine/operator, few production disruptions, or few changes of the same worker between different resources), we employ different objective functions that are all based on elementary combinatorial properties of the schedule matrix. We propose simple and efficient algorithms to solve the corresponding optimization problems, and provide hardness results where such algorithms most likely do not exist.
Keywords: Assignment problem; Changeover cost; Algorithm (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221713009107
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:236:y:2014:i:1:p:37-50
DOI: 10.1016/j.ejor.2013.11.011
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().