On the complexity of project scheduling to minimize exposed time
Edieal Pinker,
Joseph Szmerekovsky and
Vera Tilson
European Journal of Operational Research, 2014, vol. 237, issue 2, 448-453
Abstract:
We consider project scheduling where the project manager’s objective is to minimize the time from when an adversary discovers the project until the completion of the project. We analyze the complexity of the problem identifying both polynomially solvable and NP-hard versions of the problem. The complexity of the problem is seen to be dependent on the nature of renewable resource constraints, precedence constraints, and the ability to crash activities in the project.
Keywords: Complexity theory; Project scheduling; Secret project; NP-complete; Polynomial algorithm (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221714001283
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:237:y:2014:i:2:p:448-453
DOI: 10.1016/j.ejor.2014.02.013
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().