On the MILP model for the U-shaped assembly line balancing problems
Ali Fattahi and
Metin Turkay
European Journal of Operational Research, 2015, vol. 242, issue 1, 343-346
Abstract:
U-shaped assembly lines are an important configuration of modern manufacturing systems due to their flexibility to adapt to varying market demands. In U-shaped lines, tasks are assigned after their predecessors or successors. Some MILP models have been proposed to formulate the U-shaped assembly line balancing problem using either–or constraints to express precedence relationships. We show that this modeling approach reported in the literature may often find optimal solutions that are infeasible and verify this on a large set of benchmark problems. We present a revision to this model to accurately express the precedence relationships without introducing additional variables or constraints. We also illustrate on the same benchmark problems that our revision always reports solutions that are feasible.
Keywords: Integer programming; Facilities planning and design; U-shaped assembly lines (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221714008583
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:242:y:2015:i:1:p:343-346
DOI: 10.1016/j.ejor.2014.10.036
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().