Corrigendum to ‘‘Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules’’ [Eur. J. Oper. Res. 210 (2011) 495–513]
Joaquín Bautista and
Alberto Cano
European Journal of Operational Research, 2015, vol. 247, issue 1, 338-338
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221715005366
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:247:y:2015:i:1:p:338-338
DOI: 10.1016/j.ejor.2015.06.022
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().