EconPapers    
Economics at your fingertips  
 

Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption

S. Afshin Mansouri, Emel Aktas and Umut Besikci

European Journal of Operational Research, 2016, vol. 248, issue 3, 772-788

Abstract: Sustainability considerations in manufacturing scheduling, which is traditionally influenced by service oriented performance metrics, have rarely been adopted in the literature. This paper aims to address this gap by incorporating energy consumption as an explicit criterion in shop floor scheduling. Leveraging the variable speed of machining operations leading to different energy consumption levels, we explore the potential for energy saving in manufacturing. We analyze the trade-off between minimizing makespan, a measure of service level and total energy consumption, an indicator for environmental sustainability of a two-machine sequence dependent permutation flowshop. We develop a mixed integer linear multi-objective optimization model to find the Pareto frontier comprised of makespan and total energy consumption. To cope with combinatorial complexity, we also develop a constructive heuristic for fast trade-off analysis between makespan and energy consumption. We define lower bounds for the two objectives under some non-restrictive conditions and compare the performance of the constructive heuristic with CPLEX through design of experiments. The lower bounds that we develop are valid under realistic assumptions since they are conditional on speed factors. The Pareto frontier includes solutions ranging from expedited, energy intensive schedules to prolonged, energy efficient schedules. It can serve as a visual aid for production and sales planners to consider energy consumption explicitly in making quick decisions while negotiating with customers on due dates. We provide managerial insights by analyzing the areas along the Pareto frontier where energy saving can be justified at the expense of reduced service level and vice versa.

Keywords: Green scheduling; Sustainable manufacturing; Multi-objective optimization; Sequence-dependent setup times (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (38)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221715008206
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:248:y:2016:i:3:p:772-788

DOI: 10.1016/j.ejor.2015.08.064

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:248:y:2016:i:3:p:772-788