The two-machine flowshop total completion time problem: Branch-and-bound algorithms based on network-flow formulation
Boris Detienne,
Ruslan Sadykov and
Shunji Tanaka
European Journal of Operational Research, 2016, vol. 252, issue 3, 750-760
Abstract:
We consider the flowshop problem on two machines with sequence-independent setup times to minimize total completion time. Large scale network flow formulations of the problem are suggested together with strong Lagrangian bounds based on these formulations. To cope with their size, filtering procedures are developed. To solve the problem to optimality, we embed the Lagrangian bounds into two branch-and-bound algorithms. The best algorithm is able to solve all 100-job instances of our testbed with setup times and all 140-job instances without setup times, thus significantly outperforming the best algorithms in the literature.
Keywords: Scheduling; Flowshop; Branch-and-bound; Lagrangian relaxation (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221716300224
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:252:y:2016:i:3:p:750-760
DOI: 10.1016/j.ejor.2016.02.003
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().