Project rankings for participatory budget based on the fuzzy TOPSIS method
Dariusz Walczak and
Aleksandra Rutkowska
European Journal of Operational Research, 2017, vol. 260, issue 2, 706-714
Abstract:
In this study, a fuzzy technique is proposed for order preference based on the similarity to an ideal solution for the personalized ranking of projects in a participatory budget (PB). A PB is a group decision-making process where citizens distribute public resources among a set of city investment proposals. The dynamic growth in the popularity of PB during the last 10 years has been due to a significant increase in the number of projects submitted and the demonstrable weakness of the traditional majority vote. The rationality of decision-makers is restricted by the large number of possible options from which voters can choose only a few within a limited amount of time, and thus there is no opportunity to review all of the projects. Appropriate decision support tools can assist with the selection of the best outcome and help to address the growth of PB processes. The ranking of PB projects is a specific problem because multi-criteria comparisons are based on non-quantitative criteria, i.e., nominal and fuzzy criteria. The “Technique for Order Preference by Similarity to Ideal Solution” (TOPSIS) method aims to minimize the distance to the ideal alternative while maximizing the distance to the worst. In a fuzzy extension of TOPSIS, the ratings of alternatives and the weights of the criteria are fuzzy numbers or linguistic variables. The major modification required to the TOPSIS method for PB is that the perfect objective solution does not exists among the maximum and minimum values for the criteria. Thus, the subjective choice is the ideal solution for the decision maker and the negative ideal solution is the most dissimilar solution. This study describes the application of fuzzy TOPSIS with a modification for PB based on an empirical example from a Poznań PB project (Poland).
Keywords: Community operational research; Participatory budget; Project ranking; Fuzzy TOPSIS (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (13)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221716310785
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:260:y:2017:i:2:p:706-714
DOI: 10.1016/j.ejor.2016.12.044
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().