EconPapers    
Economics at your fingertips  
 

Two-machine flow shop and open shop scheduling problems with a single maintenance window

Gur Mosheiov, Assaf Sarig, Vitaly A Strusevich and Jonathan Mosheiff

European Journal of Operational Research, 2018, vol. 271, issue 2, 388-400

Abstract: The paper considers the two-machine flow shop and open shop scheduling problems to minimize the makespan, provided that one of the machines is subject to maintenance, which has to start within a prescribed time window. In the case of the flow shop, maintenance is performed on the second machine. A non-resumable setting is considered, i.e., if a job cannot be completed prior to the maintenance, it must restart from scratch after the maintenance. For each of these NP-hard problems we develop a 3/2–approximation algorithm.

Keywords: Scheduling; Flow shop; Open shop; Machine maintenance start window; Approximation algorithm (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221718303229
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:271:y:2018:i:2:p:388-400

DOI: 10.1016/j.ejor.2018.04.019

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:271:y:2018:i:2:p:388-400