A three-dimensional spatial resource-constrained project scheduling problem: Model and heuristic

Jingwen Zhang, Lubo Li, Erik Demeulemeester and Haohua Zhang

European Journal of Operational Research, 2024, vol. 319, issue 3, 943-966

Abstract: For a class of complex engineering projects executed in limited construction sites, spatial resources with three dimensions usually become a bottleneck that hampers their smooth implementation. Serious time-space conflicts frequently occur when multiple activities are carried out in parallel during some time periods. We propose a new project scheduling problem with three-dimensional spatial resource constraints (3D-sRCPSP), and a four-dimensional time-space is adopted to build the model for our 3D-sRCPSP. Firstly, in order to express the impacts of constrained sites on scheduling activities, two types of spatial constraints are refined and modeled: non-overlapping among active subspaces and not exceeding the total space, and then an integer programming model for the 3D-sRCPSP is formalized. Secondly, a novel heuristic algorithm is developed to solve the 3D-sRCPSP, which is embedded with 36 priority rules (PRs) and 3 instructive space allocation strategies. Besides 25 PRs for the traditional RCPSP, 11 new forms of PRs are extracted based on the features of 3D spatial resources. Thirdly, extensive numerical experiments are implemented to validate our model and heuristics. The instances are obtained by configuring the specific parameters of 3D spatial resources for benchmarks from PSPLIB library. One distinctive finding is that some existing PRs that perform well in the traditional RCPSP do not act best in the 3D-sRCPSP. On the other hand, the optimal solutions of very small-scale instances can be obtained by Gourbi solver, but our customized heuristic algorithm is more effective than Gourbi for general instances with medium/large sizes. Overall, the designed heuristics can effectively eliminate time-space conflicts in the planning stage of a project. Finally, as extension studies, the decision tree model is constructed to adaptively select the best PRs for each instance according to the indicators of project instances. These results can help project managers schedule activities and allocate spatial resources more accurately when encountering narrow construction sites.

Keywords: Three-dimensional spatial resources; Time-space conflicts; Project scheduling problem; Space allocation strategies; Priority rules (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221724005575
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:319:y:2024:i:3:p:943-966

DOI: 10.1016/j.ejor.2024.07.018

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:319:y:2024:i:3:p:943-966