Fifty years of research on resource-constrained project scheduling explored from different perspectives
Christian Artigues,
Sönke Hartmann and
Mario Vanhoucke
European Journal of Operational Research, 2026, vol. 328, issue 2, 367-389
Abstract:
The resource-constrained project scheduling problem is one of the most investigated problems in the project scheduling literature, and has a rich history. This article provides a perspective on this challenging scheduling problem, without having the ambition to provide a complete overview. Instead, the article does aim to summarize a number of reasons why this problem has been so intensely investigated from different perspectives.
Keywords: Project scheduling; Resource-constraints; Literature review; Project data; Methodological advances; Variants and extensions (search for similar items in EconPapers)
Date: 2026
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221725002218
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:328:y:2026:i:2:p:367-389
DOI: 10.1016/j.ejor.2025.03.024
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().