Jie Song, Jinbo Song, Tyson Browning and Mario Vanhoucke

European Journal of Operational Research, 2026, vol. 328, issue 2, 646-667

Abstract: Project monitoring and control (PMC) is a process of measuring a project’s progress and taking corrective action when necessary to ensure successful project completion. However, most existing models lack empirical validation of their assumptions and effectiveness, which limits their practical use. We fill in this gap by using empirical data from 97 real projects to calibrate activity-duration distributions and assess activity-duration dependencies, integrating these empirical foundations into an enhanced PMC model. We further improve the model by incorporating budget-release timing constraints and introducing two new policies for crashing and fast-tracking based on a project’s specific time and cost characteristics. Extensive computational experiments using empirical and artificial data evaluate the effectiveness of these policies. Because the budget-release policies and corrective action types depend on project characteristics such as activity-duration dependencies and topological network structure, key insights from this study can be usefully applied by project managers as heuristics even without a detailed model of their project.

Keywords: Project management; Calibration method; Empirical data; Budget-release policy (search for similar items in EconPapers)
Date: 2026
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S037722172500476X
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:328:y:2026:i:2:p:646-667

DOI: 10.1016/j.ejor.2025.06.007

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-10-07
Handle: RePEc:eee:ejores:v:328:y:2026:i:2:p:646-667