Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach
Bing Wang,
Ioan Nistor,
Tad Murty and
Yi-Ming Wei
Energy Economics, 2014, vol. 46, issue C, 112-121
Abstract:
Hydropower plays a major role in the Canadian electricity generation industry. Few attempts have been made, however, to assess the efficiency of hydropower generation in Canada. This paper analyzes the overall efficiency of hydropower generation in Canada from comprehensive viewpoints of electricity generating capability, its profitability, as well as environmental benefits and social responsibility using the TOPSIS (the Technique for Order Preference by Similarity to Ideal Solution) method. The factors that influence the efficiency of the hydropower generation are also presented to help to the sustainable hydropower production in Canada. The most important results of this study concern (1) the pivotal roles of energy saving and of the social responsibility in the overall efficiency of hydropower corporates and (2) the lower hydropower generation efficiency of some of the most important economic regions in Canada. Other results reveal that the overall efficiency of hydropower generation in Canada experienced an improvement in 2012, following a downtrend from 2005 to 2011. Amidst these influencing factors, energy saving and social responsibility are key factors in the overall efficiency scores while management (defined herein by the number of employees and hydropower stations of a corporation) has only a slightly negative impact on the overall efficiency score.
Keywords: Hydropower efficiency; TOPSIS; Social responsibility; Energy saving; Benchmarking management (search for similar items in EconPapers)
JEL-codes: C30 C44 D61 Q21 Q51 Q54 (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (23)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0140988314002102
Full text for ScienceDirect subscribers only
Related works:
Working Paper: Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach (2014) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:eneeco:v:46:y:2014:i:c:p:112-121
DOI: 10.1016/j.eneco.2014.09.001
Access Statistics for this article
Energy Economics is currently edited by R. S. J. Tol, Beng Ang, Lance Bachmeier, Perry Sadorsky, Ugur Soytas and J. P. Weyant
More articles in Energy Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().