EconPapers    
Economics at your fingertips  
 

Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach

Bing Wang, Ioan Nistor, Tad Murty and Yi-Ming Wei

No 66, CEEP-BIT Working Papers from Center for Energy and Environmental Policy Research (CEEP), Beijing Institute of Technology

Abstract: Hydropower plays a major role in the Canadian electricity generation industry. Few attempts have been made, however, to assess the efficiency of hydropower generation in Canada. This paper analyzes the overall efficiency of hydropower generation in Canada from comprehensive viewpoints of electricity generating capability, its profitability, as well as environmental benefits and social responsibility using the TOPSIS (the Technique for Order Preference by Similarity to Ideal Solution) method. The factors that influence the efficiency of the hydropower generation are also presented to help to the sustainable hydropower production in Canada. The most important results of this study concern (1) the pivotal roles of energy saving and of the social responsibility in the overall efficiency of hydropower corporates and (2) the lower hydropower generation efficiency of some of the most important economic regions in Canada. Other results reveal that the overall efficiency of hydropower generation in Canada experienced an improvement in 2012 following a downtrend from 2005 to 2011. Amidst these influencing factors, energy saving and social responsibility are key factors in the overall efficiency scores while management (defined herein by the number of employees and hydropower stations of a corporation) has only a slightly negative impact on the overall efficiency score.

Keywords: Hydropower efficiency; TOPSIS; Social responsibility; Energy saving; Benchmarking management (search for similar items in EconPapers)
JEL-codes: Q40 Q58 (search for similar items in EconPapers)
Pages: 23 pages
Date: 2014-08-21
New Economics Papers: this item is included in nep-ene
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (24)

Downloads: (external link)
http://ceep.bit.edu.cn/docs/2018-10/20181011141226833366.pdf (application/pdf)
Our link check indicates that this URL is bad, the error code is: 404 Not Found (http://ceep.bit.edu.cn/docs/2018-10/20181011141226833366.pdf [302 Found]--> https://ceep.bit.edu.cn/docs/2018-10/20181011141226833366.pdf)

Related works:
Journal Article: Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach (2014) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:biw:wpaper:66

Access Statistics for this paper

More papers in CEEP-BIT Working Papers from Center for Energy and Environmental Policy Research (CEEP), Beijing Institute of Technology Contact information at EDIRC.
Bibliographic data for series maintained by Zhi-Fu Mi ().

 
Page updated 2025-03-30
Handle: RePEc:biw:wpaper:66