Abstract:
A coal-fired steam power plant, which will be located in Southern Nevada, has been analysed with the aid of the method presented in Part I. The exergoeconomic analysis suggests that decreasing the exergy losses for the components steam boiler/reheater, feedwater preheaters, and low-pressure turbine may lead to a reduction in electricity cost although the capital costs will increase.
Date: 1985
References: View complete reference list from CitEc
Citations: View citations in EconPapers (43)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0360544285900210
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:10:y:1985:i:1:p:81-94
DOI: 10.1016/0360-5442(85)90021-0
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().