Primary control reserve of electric power by feedwater flow rate change through an additional economizer – A case study of the thermal power plant “Nikola Tesla B”
Vladimir D. Stevanovic,
Milica Ilic,
Zeljko Djurovic,
Tadeusz Wala,
Slawomir Muszynski and
Ivan Gajic
Energy, 2018, vol. 147, issue C, 782-798
Abstract:
Coal-fired thermal power plants (TPPs) had been generally designed to cover base loads of electricity consumption. Nowadays, they should be flexible to participate in the primary frequency control of electric system, especially because of increased number of wind and solar plants with intermittent electricity production.
Keywords: Primary power control; Steam power unit; Economizer; High pressure feed water heaters; Steam extraction (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544218301208
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:147:y:2018:i:c:p:782-798
DOI: 10.1016/j.energy.2018.01.102
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().