Analysis of the factors contributing to the one trillion dollars wasted on nuclear power

Massoud T. Simnad

Energy, 1989, vol. 14, issue 9, 503-511

Abstract: The impacts of societal and regulatory impediments on the cost of generating electricity from nuclear power plants are addressed in this study. Economic losses are incurred as the result of 1.(a) interest payments for capital and2.(b) excessive incremental costs for replacement power (resulting from construction delays or from cancellation of partially or completely built reactors). The total costs for these delays or cancellations are estimated to be approximately $500 billion each for the US and non-US countries (including the Eastern Block).

Date: 1989
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0360544289900212
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:14:y:1989:i:9:p:503-511

DOI: 10.1016/0360-5442(89)90021-2

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:14:y:1989:i:9:p:503-511