Fort St. Vrain operations and future
H.L. Brey
Energy, 1991, vol. 16, issue 1, 47-58
Abstract:
June 1989 resulted in the highest electric generation month in the history of the Fort St. Vrain plant. This culminated an excellent operating period involving the first half of 1988. The plant was then shutdown in July on a scheduled outage to make repairs in the main steam drive section of all of the helium circulators. This outage was significantly extended due to problems with moisture ingress into the primary coolant felt to be primarily from the core support floor section of the liner cooling system.
Date: 1991
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0360544291900862
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:16:y:1991:i:1:p:47-58
DOI: 10.1016/0360-5442(91)90086-2
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().