Area- and time-specific marginal capacity costs of electricity distribution
Chi-Keung Woo,
Ren Orans,
Brian Horii,
Roger Pupp and
Grayson Heffner
Energy, 1994, vol. 19, issue 12, 1213-1218
Abstract:
Marginal costs of electricity vary by time and location. In the past, researchers attributed the variations to factors related to electricity generation and transmission. These authors, however, have not analyzed possible variations in marginal distribution capacity costs (MDCC). The objectives of this paper are: 1.(i) to show that large MDCC variations are due to the dispersion in distribution capital expenditures by time and space,2.(ii) to propose a method for quantifying the area- and time-specific MDCC in the presence of lumpy investments, and3.(iii) to compare our MDCC estimates to those commonly used in the electric utility industry. Our proposed method and its results were adopted by the California Public Utilities Commission (CPUC) in 1992 for Pacific Gas and Electric Company (PG&E), the largest privately owned electric utility in the U.S.
Date: 1994
References: View complete reference list from CitEc
Citations: View citations in EconPapers (9)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/036054429490023X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:19:y:1994:i:12:p:1213-1218
DOI: 10.1016/0360-5442(94)90023-X
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().