EconPapers    
Economics at your fingertips  
 

A robust internet-based auction to procure electricity forwards

Chi-Keung Woo, D. Lloyd, M. Borden, R. Warrington and C. Baskette

Energy, 2004, vol. 29, issue 1, 1-11

Abstract: Securing forward contracts to manage procurement-cost risk is an intuitively appealing and economically reasonable strategy for a load-serving local distribution company (LDC) in today’s volatile electricity marketplace. However, knowing what to buy does not guarantee least-cost implementation. The forward-contract price quoted by a prospective seller may not be the ‘best deal’ that an LDC could have obtained, especially when the forward contract desired by the LDC is not actively traded. This paper reports the results from five internet-based auctions for electricity forward contracts with non-firm delivery and varying hourly quantities held monthly by a Florida municipal utility (MU) from September 2002 to January 2003. The results confirm that a multi-round auction design is robust in realizing competitive price offers made by credit-worthy sellers, time-efficient contracting, and consistent cost savings to the MU. Thus, the Anglo-Dutch auction described herein is a reasonable substitute for generation ownership by an LDC.

Date: 2004
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544203002032
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:29:y:2004:i:1:p:1-11

DOI: 10.1016/j.energy.2003.08.002

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:29:y:2004:i:1:p:1-11