Implementation of on-line performance monitoring system at Seoincheon and Sinincheon combined cycle power plant
Si-Moon Kim and
Yong-Jin Joo
Energy, 2005, vol. 30, issue 13, 2383-2401
Abstract:
As a result of the restructuring of the Korean Power Generation Industry, Korean power companies are under increased pressure to increase capacity and lower operating costs. In order to achieve these goals, an on-line real-time performance monitoring system has been introduced to the Seoincheon and Sinincheon combined cycle power plants (CCPP). The on-line real-time performance monitoring and optimization system helps plant personnel operate the plants profitably by tracking plant performance changes based on real-time information. This paper outlines how the on-line performance monitoring system is being used to improve the operational efficiency and optimize equipment maintenance. Case studies showing the benefits provided by the system are presented. This system will be useful for the plants to respond to the competitive electricity market.
Date: 2005
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544205000022
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:30:y:2005:i:13:p:2383-2401
DOI: 10.1016/j.energy.2005.01.001
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().