EconPapers    
Economics at your fingertips  
 

Demand side management in Nepal

Ming Yang

Energy, 2006, vol. 31, issue 14, 2677-2698

Abstract: The objective of this paper is to identify the most cost-effective areas for Demand Side Management (DSM) in Nepal. On-site interviews were undertaken with power utilities (the Nepal Electricity Authority or NEA and its sub-companies) and various electricity end-users in Nepal to collect data, as well as walk-through auditing at the end-users’ premises. International standard financial and economic analysis methodologies were used to project cost-effectiveness assessments. This paper concludes that the majority of the potential DSM technologies in Nepal are financially viable and that the most cost-effective areas for DSM technologies in Nepal include power factor (cosϕ) correction; energy-efficient lighting in the residential and commercial sectors; and the installation of intelligent motor controllers for industrial induction motors.

Keywords: Cost-benefit analysis; “hard” DSM programs; Developing country (search for similar items in EconPapers)
Date: 2006
References: View complete reference list from CitEc
Citations: View citations in EconPapers (12)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544206000077
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:31:y:2006:i:14:p:2677-2698

DOI: 10.1016/j.energy.2005.12.008

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:31:y:2006:i:14:p:2677-2698