Modeling regulatory policies associated with offshore structure removal requirements in the Gulf of Mexico
Mark J. Kaiser
Energy, 2008, vol. 33, issue 7, 1038-1054
Abstract:
Federal regulations require that a lease in the Outer Continental Shelf of the Gulf of Mexico be cleared of all structures within one year after production on the lease ceases, but in recent years, the Minerals Management Service has begun to encourage operators to remove idle (non-producing) structures on producing leases that are no longer “economically viable”. At the end of 2003, there were 2175 producing structures, 898 idle (non-producing) structures, and 440 auxiliary (never-producing) structures on 1356 active leases; and 329 idle structures and 65 auxiliary structures on 273 inactive leases. The purpose of this paper is to model the impact of alternative regulatory policies on the removal trends of structures and the inventory of idle iron, and to provide first-order estimates of the cost of each regulatory option. A description of the modeling framework and implementation results is presented.
Keywords: Decommissioning; Environment; Government policies; Regulatory policy (search for similar items in EconPapers)
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544208000297
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:33:y:2008:i:7:p:1038-1054
DOI: 10.1016/j.energy.2008.01.018
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().