EconPapers    
Economics at your fingertips  
 

Energy storage requirements for in-stream tidal generation on a limited capacity electricity grid

Sebastian Manchester, Behzad Barzegar, Lukas Swan and Dominic Groulx

Energy, 2013, vol. 61, issue C, 283-290

Abstract: This study presents the modeling and analysis of an ESS (energy storage system) for a TEC (tidal energy converter) to be installed in the Bay of Fundy, Canada. The electricity distribution grid that services the region has a minimum annual electricity demand of 0.9 MW. Policy limits the installation of renewable electricity generators to 0.9 MW at this site. An existing 0.9 MW WEC (wind energy converter) occupies this capacity, inhibiting further installations. The use of an ESS enables the installation of a 0.5 MW TEC by ensuring the combined electricity output from WEC and TEC does not exceed 0.9 MW. The objective of this study is to model the system and determine the characteristics of the ESS capacity, power, and cyclic nature.

Keywords: Tidal; Energy; Storage; Interconnection; Turbine; Wind (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (11)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544213007123
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:61:y:2013:i:c:p:283-290

DOI: 10.1016/j.energy.2013.08.036

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:61:y:2013:i:c:p:283-290