Cost analysis for LWR power plants
W.E. Mooz
Energy, 1981, vol. 6, issue 3, 197-225
Abstract:
A statistical analysis of light water reactor power plant capital costs that uses a data base that is larger and of higher quality than that used in a previous study. The data span six years, and include virtually all U.S. LWR power plants presently in commercial operation. During this period average capital costs increased at the rate of about $140/k We (1978 dollars) per year, and average construction time increased at the rate of about 4 months per year. Significant economies of scale, either in construction time or capital cost, were not detected. Other findings were that plants built in the Northeast continued to show higher average costs than those in the rest of the country, the experience of the architect-engineer is a factor in reducing costs, and the costs of plants with cooling towers could not be distinguished from those without.
Date: 1981
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0360544281900463
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:6:y:1981:i:3:p:197-225
DOI: 10.1016/0360-5442(81)90046-3
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().