Criteria for smart grid deployment in Brazil by applying the Delphi method
Joaquim J.M. Galo,
Maria N.Q. Macedo,
Luiz A.L. Almeida and
Antonio C.C. Lima
Energy, 2014, vol. 70, issue C, 605-611
Abstract:
The deployment of smart grids has become a global trend in the most diverse electrical systems. This strategy aims to increase the control and efficiency of electrical systems. However, this deployment requires major changes to systems, for example, the information of a telecommunications infrastructure and the provision of adequate equipment, human resources and financial resources. In Brazil, which is territorially large and contains a power distribution system with centralised generation, the deployment of smart grids tends to be time-consuming and could require decades to complete, as well as a large monetary investment. Therefore, the elaboration and implementation of well-defined criteria are necessary for the planning steps of this deployment to minimise the investment cost.
Keywords: Criteria; Delphi method; Deployment; Smart grid (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (12)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544214004460
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:70:y:2014:i:c:p:605-611
DOI: 10.1016/j.energy.2014.04.033
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().