EconPapers    
Economics at your fingertips  
 

Consequences of size increases and thermodynamic constraints on steam-powerplant availability: Comparison between nuclear and fossil-fueled units

Angelo Spena and Enzo Chiricozzi

Energy, 1983, vol. 8, issue 7, 553-559

Abstract: By comparing the two largest thermoelectric units recently brought into operation in Italy (i.e., a 660-MWe fossil-fueled supercritical unit and an 860-MWe nuclear direct cycle BWR), we obtain information on the effects of size limits on powerplant availability. We assume that torsional vibrations are among the most severe causes of damage, while short circuits at the generator terminals cause the most serious fault in a power station. Computer-aided simulation of the dynamical behaviour of the two units shows the nuclear unit to be less severely stressed, thus producing longer life and better long-term reliability.

Date: 1983
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0360544283900816
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:8:y:1983:i:7:p:553-559

DOI: 10.1016/0360-5442(83)90081-6

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:8:y:1983:i:7:p:553-559