Optimal dynamic allocation of mobile plants to monetize associated or stranded natural gas, part II: Dealing with uncertainty
Siah Hong Tan and
Paul I. Barton
Energy, 2016, vol. 96, issue C, 461-467
Abstract:
Using the Bakken shale play as a case study, the previous part of this two-part series demonstrated how small-scale mobile plants could be used to monetize associated or stranded gas effectively. Here, we address the issue of uncertainty in future supply, demand and price conditions. To this end, we modified our multi-period optimization framework to a stochastic programming framework to account for various scenarios with different parameter realizations in the future. The maximum ENPV (expected net present value) obtained was $2.01 billion, higher than the NPV obtained in the previous part. In addition, the value of the stochastic solution was 0.11% of the optimal ENPV, indicating that the flexible nature of mobile plants affords them a great advantage when dealing with uncertainty.
Keywords: Natural gas monetization; Mobile modular plants; Mixed-integer linear programming; Two-stage stochastic programming; Parametric uncertainty; Bakken shale play (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544215017144
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:96:y:2016:i:c:p:461-467
DOI: 10.1016/j.energy.2015.12.069
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().