Lessons from a project to create performance measures for public health
Teresa Hubley
Evaluation and Program Planning, 2008, vol. 31, issue 4, 410-415
Abstract:
This paper uses a specific example to illustrate complications that arise in formulating and implementing performance measures. The context of this demonstration is a Centers for Disease Control and Prevention (CDC)-funded project to explore the feasibility of performance measures developed at the national level for local sexually transmitted disease (STD) prevention and control programs. Grantees provided local data and reported on their experience in eliciting the data and using the results for program development. The experience of this project suggests that measures can be made operationally feasible and programmatically useful only if terminologies are subjected to extensive definition and clarification activities. These activities must include development of common language, mapping of workflows, and clarification of spheres of influence. Finally, performance measures must be used with some caution, as they often unintentionally capture extraneous program elements.
Keywords: Performance; measures; Public; health; Planning (search for similar items in EconPapers)
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0149-7189(08)00063-3
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:epplan:v:31:y:2008:i:4:p:410-415
Access Statistics for this article
Evaluation and Program Planning is currently edited by Jonathan A. Morell
More articles in Evaluation and Program Planning from Elsevier
Bibliographic data for series maintained by Catherine Liu ().