Will the children use it?—A RE-AIM evaluation of a local public open space intervention involving children from a deprived neighbourhood
Charlotte Skau Pawlowski,
Tanja Schmidt,
Jonas Vestergaard Nielsen,
Jens Troelsen and
Jasper Schipperijn
Evaluation and Program Planning, 2019, vol. 77, issue C
Abstract:
Knowledge on how to improve public open spaces in deprived neighbourhoods to increase active living among children is scarce and comprehensively evaluated public open space interventions are needed. Firstly, the aim was to explore if involving 39 local fifth-grade children (10–11 years old) from a deprived neighbourhood in creating playable installations in a public open space influenced their use of this space. Secondly, we wanted to explore if the Reach, Effectiveness, Adoption, Implementation and Maintenance framework (RE-AIM) was useful for evaluating different stages in the intervention project. RE-AIM was applied through a convergent mixed-methods triangulation design using survey, accelerometer, GPS, and interviews as data sources. Effectiveness outcomes revealed that on average the space was used less by the 39 children after the intervention. The implementation and maintenance dimensions revealed aspects of why most children involved in the project did not use the space after intervention. The evaluation cast light on children’s perceptions of their role, and importance of maintenance when the intervention was completed. In future, all dimensions of built environmental projects would benefit from being planned and evaluated in a collaboration with all project partners using an evaluation framework integrated and applied from the beginning of the project.
Keywords: Deprived neighbourhood; Active living; Children; RE-AIM; Participatory design; Public open space; Implementation; Maintenance (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0149718918303409
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:epplan:v:77:y:2019:i:c:s0149718918303409
DOI: 10.1016/j.evalprogplan.2019.101706
Access Statistics for this article
Evaluation and Program Planning is currently edited by Jonathan A. Morell
More articles in Evaluation and Program Planning from Elsevier
Bibliographic data for series maintained by Catherine Liu ().