Three-parametrical harmonization model in project management by means of simulation
Ehud Menipaz and
Avner Ben-Yair
Mathematics and Computers in Simulation (MATCOM), 2002, vol. 59, issue 5, 431-436
Abstract:
A PERT-COST type project with random activity duration is considered. The project comprises several essential parameters which practically define the quality of the project as a whole:
Keywords: Project’s utility; Three-parametrical harmonization model; Cyclic coordinate search algorithm (search for similar items in EconPapers)
Date: 2002
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S037847540100430X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:matcom:v:59:y:2002:i:5:p:431-436
Access Statistics for this article
Mathematics and Computers in Simulation (MATCOM) is currently edited by Robert Beauwens
More articles in Mathematics and Computers in Simulation (MATCOM) from Elsevier
Bibliographic data for series maintained by Catherine Liu ().