Harmonization simulation model for managing several stochastic projects
Ehud Menipaz and
Avner Ben-Yair
Mathematics and Computers in Simulation (MATCOM), 2002, vol. 61, issue 1, 61-66
Abstract:
A highly complicated project management system including several simultaneously realized PERT-COST type network projects, is considered. The projects are of different importance and significance; for each project its corresponding priority index is pre-given. The total budget at the project management disposal to carry out all the projects, is limited. Given for each project its priority value, the problem is to determine optimal budget assignments and optimal due dates of accomplishing each project, to maximize the weighted sum of the projects’ utilities. The problem centers on maximizing the system’s utility by implementing the harmonization model for each single project, which has been outlined in our previous publication [Math. Comput. Simul. (2002)]. Thus, the paper under consideration is an essential extension of that publication.
Keywords: System’s utility; Harmonization model; Budget reassignment among several projects; Partial harmonization model; Linear programming algorithm (search for similar items in EconPapers)
Date: 2002
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0378475402001350
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:matcom:v:61:y:2002:i:1:p:61-66
Access Statistics for this article
Mathematics and Computers in Simulation (MATCOM) is currently edited by Robert Beauwens
More articles in Mathematics and Computers in Simulation (MATCOM) from Elsevier
Bibliographic data for series maintained by Catherine Liu ().