A bi-objective genetic algorithm approach to risk mitigation in project scheduling
Murat KIlIç,
Gündüz Ulusoy and
Funda Sivrikaya Serifoglu
International Journal of Production Economics, 2008, vol. 112, issue 1, 202-216
Abstract:
A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization problem, where the expected makespan and the expected total cost are both to be minimized. The expected total cost is the sum of four cost components: overhead cost, activity execution cost, cost of reducing risks and penalty cost for tardiness. Risks for activities are predefined. For each risk at an activity, various levels are defined, which correspond to the results of different preventive measures. An MIP model and a heuristic solution approach based on genetic algorithms (GAs) is proposed. GAs provide a fast and effective solution approach to the problem.
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00139-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:112:y:2008:i:1:p:202-216
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().