On the hybrid flowshop scheduling problem
Mohamed Haouari and
Lotfi Hidri
International Journal of Production Economics, 2008, vol. 113, issue 1, 495-497
Abstract:
The hybrid flowshop scheduling problem requires minimizing the makespan in a serial multiple-stage manufacturing system, where each stage consists of parallel identical machines. The purpose of this note is to pinpoint several inaccuracies contained in a recent paper and to propose a valid lower bound.
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00313-1
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:113:y:2008:i:1:p:495-497
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().