Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain
Funda Sahin,
E. Powell Robinson and
Li-Lian Gao
International Journal of Production Economics, 2008, vol. 115, issue 2, 528-541
Abstract:
This research studies master production schedule (MPS) and advanced order commitment (AOC) in two-stage supply chains. Experimental analysis, based on computer simulation, evaluates the impact of environmental and MPS design factors on optimal policy design as measured by schedule cost and stability. The vendor's order-size flexibility is the major factor impacting system performance. The manufacturer's optimal MPS policy is often inefficient for the vendor, resulting in total costs significantly greater than the optimal system policy. The research provides insight into the dynamic nature of scheduling and procurement systems and how they can be better coordinated through the MPS/AOC policy design.
Keywords: Master; production; scheduling; Materials; requirement; planning; Supply; chain; management; Simulation (search for similar items in EconPapers)
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (14)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00213-2
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:115:y:2008:i:2:p:528-541
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().