EconPapers    
Economics at your fingertips  
 

Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing

Kune-muh Tsai and Shan-chi Wang

International Journal of Production Economics, 2009, vol. 117, issue 1, 174-184

Abstract: Available-to-promise (ATP) serves as a significant factor to enhance customer service in order promising. Most research regarding ATP considered only one plant and was not mainly developed under the make-to-order (MTO) or assemble-to-order (ATO) strategy. We constructed a generic three-stage model of multi-site ATP mechanism for ATO manufacturing and experimented on a local TFT-LCD manufacturer. We further tested eight scenarios of ATP allocation plans based on different cost structures in the objective functions to compare the ATP plans and performances. Results showed that we can obtain an appropriate ATP plan with proper cost structure.

Keywords: Available-to-promise; Assemble-to-order; Multi-site; TFT-LCD; manufacturing (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (10)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00353-8
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:117:y:2009:i:1:p:174-184

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:117:y:2009:i:1:p:174-184