Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing
Kune-muh Tsai and
Shan-chi Wang
International Journal of Production Economics, 2009, vol. 117, issue 1, 174-184
Abstract:
Available-to-promise (ATP) serves as a significant factor to enhance customer service in order promising. Most research regarding ATP considered only one plant and was not mainly developed under the make-to-order (MTO) or assemble-to-order (ATO) strategy. We constructed a generic three-stage model of multi-site ATP mechanism for ATO manufacturing and experimented on a local TFT-LCD manufacturer. We further tested eight scenarios of ATP allocation plans based on different cost structures in the objective functions to compare the ATP plans and performances. Results showed that we can obtain an appropriate ATP plan with proper cost structure.
Keywords: Available-to-promise; Assemble-to-order; Multi-site; TFT-LCD; manufacturing (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00353-8
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:117:y:2009:i:1:p:174-184
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().