EconPapers    
Economics at your fingertips  
 

Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems

Nima Safaei and Reza Tavakkoli-Moghaddam

International Journal of Production Economics, 2009, vol. 120, issue 2, 301-314

Abstract: In this paper, an integrated mathematical model of the multi-period cell formation and production planning in a dynamic cellular manufacturing system (DCMS) is proposed with the aim of minimizing machine, inter/intra-cell movement, reconfiguration, partial subcontracting, and inventory carrying costs. This paper puts emphasis on the effect of the trade-off between production and outsourcing costs on the re-configuration of the cells in cellular manufacturing systems (CMSs) under a dynamic environment, in which the product mix is different from a period to another resulting in the operational dynamism in the cells. The proposed model is verified by a number of numerical examples and related sensitivity analysis.

Keywords: Multi-period; cell; formation; Dynamic; cellular; manufacturing; system; Production; planning; Reconfiguration; Partial; subcontracting (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00007-3
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:120:y:2009:i:2:p:301-314

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:301-314