EconPapers    
Economics at your fingertips  
 

Best-matching protocols for assembly in e-work networks

J.D. Velásquez and S.Y. Nof

International Journal of Production Economics, 2009, vol. 122, issue 1, 508-516

Abstract: Assembly networks pose many challenges to the comprising businesses due to their ever-growing distributed nature. This article explores the benefits of incorporating best-matching protocols (BMP) into the principles of design for assembly (DFA) to make better use of already existing information on equipment, parts and suppliers. Best-matching protocols for cooperation requirement planning (BMP-CRP), for part matching (BMP-part) and supplier selection were developed. A case study for the matching of parts and suppliers is provided. The results of the case study corroborate the benefits in quality and costs that the best-matching protocols can yield for businesses in an assembly e-work network.

Keywords: Selective; assembly; Cooperation; requirement; planning; Design; for; assembly; Supply; networks; Collaborative; e-work (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00215-1
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:122:y:2009:i:1:p:508-516

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:122:y:2009:i:1:p:508-516