Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain
Yu-Cheng Hsiao, 
Yi Lin and 
Yun-Kuei Huang
International Journal of Production Economics, 2010, vol. 124, issue 2, 408-413
Abstract:
Bottleneck appears in a serial supply chain if the minimum production rate at all stages is smaller than the demand rate. Operation manager must focus on keeping the bottleneck stage fully utilized and forcing the other stages to produce in synch with the bottleneck. This study applies the lot size division method, the recursive tightening method, and the drum-buffer-rope strategy. A pull and reverse pull algorithm is designed to solve the multi-stage logistic and inventory problem with a production bottleneck in a serial supply chain. A numerical example is included to illustrate the algorithm procedures.
Keywords: Inventory; Supply; chain; Bottleneck; Lot; size; division; Recursive; tightening (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc 
Citations: View citations in EconPapers (3) 
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00449-6
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX 
RIS (EndNote, ProCite, RefMan) 
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:124:y:2010:i:2:p:408-413
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics  from  Elsevier
Bibliographic data for series maintained by Catherine Liu ().