EconPapers    
Economics at your fingertips  
 

A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing

Shiqing Yao, Zhibin Jiang, Na Li, Huai Zhang and Na Geng

International Journal of Production Economics, 2011, vol. 130, issue 1, 125-133

Abstract: This paper proposes a multi-objective dynamic scheduling approach that combines three attributes based on a hybrid multiple attribute decision making (MADM) technique. With consideration of two kinds of uncertainties, three advanced attributes are specifically designed to optimize four key performance measures. Each attribute is converted into a relative closeness to the ideal alternative, and collaborate with the others at each scheduling instant. Furthermore, a cutoff method is used to make the proposed approach adapt to full-scale semiconductor manufacturing systems (SMSs) better. Results in two SMS models show that the proposed approach is validated for the real-time multi-objective scheduling problem.

Keywords: Dynamic; scheduling; Multi-objective; optimization; Multiple; attribute; decision; making; (MADM); Semiconductor; manufacturing; system; (SMS) (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00483-4
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:130:y:2011:i:1:p:125-133

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:130:y:2011:i:1:p:125-133