EconPapers    
Economics at your fingertips  
 

Heuristics for operational fixed job scheduling problems with working and spread time constraints

Deniz Türsel Eliiyi and Meral Azizoglu

International Journal of Production Economics, 2011, vol. 132, issue 1, 107-121

Abstract: Operational fixed job scheduling problems select a set of jobs having fixed ready and processing times and schedule the selected jobs on parallel machines so as to maximize the total weight. In this study, we consider working time and spread time constrained versions of the operational fixed job scheduling problems. The working time constraints limit the total processing load on each machine. The spread time constraints limit the time between the start of the first job and the finish of the last job on each machine. For the working time constrained problem, we present a filtered beam search algorithm that evaluates the promising nodes of the branch and bound tree. For the spread time constrained problem we propose a two phase algorithm that defines the promising sets for the first jobs and finds a solution for each promising set. The results of our computational tests reveal that our heuristic algorithms perform very well in terms of both solution quality and time.

Keywords: Fixed; job; scheduling; Working; time; constraints; Spread; time; constraints; Heuristics (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(11)00139-3
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:132:y:2011:i:1:p:107-121

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:132:y:2011:i:1:p:107-121