A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand
Eugene Levner,
Yael Perlman,
T.C.E. Cheng and
Ilya Levner
International Journal of Production Economics, 2011, vol. 132, issue 1, 43-51
Abstract:
A multi-echelon inventory system implies the existence of a hierarchy of stocking locations, and the dependence and interaction between them. We consider a multi-echelon, spare-part inventory management problem with outsourcing and backordering. The problem is characterized by deterministic repair time/cost, and supply and demand that lie within prescribed intervals and that vary over time. The objective is to minimize the total inventory and transportation costs. We develop a network model for problem analysis and present a network flow algorithm for solving the problem. We prove that the Wagner-Whitin property, known for the lot-sizing problem, can be extended to the spare-part inventory management problem under study.
Keywords: Spare-part; inventory; management; Multi-suppliers; Backorders; Network; model; Network; flow; algorithm; Wagner-Whitin; property (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(11)00125-3
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:132:y:2011:i:1:p:43-51
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().