EconPapers    
Economics at your fingertips  
 

Sourcing decisions of project tasks with exponential completion times: Impact on operating profits

H. Dharma Kwon, Steven A. Lippman and Christopher S. Tang

International Journal of Production Economics, 2011, vol. 134, issue 1, 138-150

Abstract: When managing a project, a firm must evaluate multiple strategic factors and operational issues before deciding which tasks to keep in-house and which to outsource. We focus on one operational aspect of this evaluation process by examining the impact of different sourcing decisions of project tasks with exponential completion times on operating profits. As an initial attempt, we present two stylized models that capture two simplest types of projects: (a) a project with two "parallel" tasks that can be performed simultaneously and (b) a project with two "serial" tasks that must be performed sequentially. For each model, we determine the optimal operating profit for the case when the firm outsources zero task, one task, or two tasks. These operating profits can be informative for making sourcing decisions of different project tasks.

Keywords: Project; management; Sourcing; decisions; Stackelberg; game (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527311002738
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:134:y:2011:i:1:p:138-150

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:134:y:2011:i:1:p:138-150