Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
T.C.E. Cheng,
Suh-Jenq Yang and
Dar-Li Yang
International Journal of Production Economics, 2012, vol. 135, issue 1, 154-161
Abstract:
Due-window assignment and production scheduling are important issues in operations management. In this study we investigate the problem of common due-window assignment and scheduling of deteriorating jobs and a maintenance activity simultaneously on a single-machine. We assume that the maintenance duration depends on its starting time. We provide polynomial time solutions for the problem and some of its special cases, where the objective is to simultaneously minimize the earliness, tardiness, due-window starting time, and due-window size costs.
Keywords: Scheduling; Due-window assignment; Deteriorating jobs; Deteriorating maintenance activity (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (23)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527310003981
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:135:y:2012:i:1:p:154-161
DOI: 10.1016/j.ijpe.2010.10.005
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().