Multiple part-type scheduling in flexible robotic cells
G. Didem Batur,
Oya Ekin Karasan and
M. Selim Akturk
International Journal of Production Economics, 2012, vol. 135, issue 2, 726-740
Abstract:
This paper considers the scheduling problem arising in two-machine manufacturing cells which repeatedly produce a set of multiple part-types, and where transportation of the parts between the machines is performed by a robot. The cycle time of the cell depends on the robot move sequence as well as the processing times of the parts on the machines. For highly flexible CNC machines, the processing times can be adjusted. To this end, this study tries to find the robot move sequence as well as the processing times of the parts on each machine that jointly minimize the cycle time. The problem of determining the best cycle in a 2-machine cell is first modeled as a traveling salesman problem. Then, an efficient 2-stage heuristic algorithm is constructed and compared with the most common heuristic approach of longest processing time (LPT).
Keywords: Flexible manufacturing systems; Robotic cell; CNC; Multiple part-type production (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527311004361
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:135:y:2012:i:2:p:726-740
DOI: 10.1016/j.ijpe.2011.10.006
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().