Adapting workload control for job shops with high routing complexity
G.D. Soepenberg,
M.J. Land and
G.J.C. Gaalman
International Journal of Production Economics, 2012, vol. 140, issue 2, 681-690
Abstract:
A relevant segment of job shop environments has to cope with specific routing complexity. When order routings are long or assembly structures exist, performance problems arise in the application of traditional job shop control concepts based on workload control (WLC). This paper investigates how to adapt the WLC concept to the needs of these job shops. A first review of literature provides only few studies considering long or assembly type routings. Consequently field research is executed, analyzing and capitalizing the influences of a control approach applied in a successful company. The derived guidelines for adaptation of the WLC concept aim at improving the synergy between controlled release, to avoid irresolvable delays at early stages, and priority dispatching at later stages of the long order routings.
Keywords: Job shop; Workload control; Long routings; Assembly (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527312001144
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:140:y:2012:i:2:p:681-690
DOI: 10.1016/j.ijpe.2012.03.018
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().