Abstract: Lot sizing and scheduling problems arise when a variety of products are manufactured in a plant of finite capacity in which a single product variant at one time can be manufactured, and changeover costs (and/or times) depend on the products scheduling sequence. MIP models developed to solve these problems are hard to be optimally solved, essentially for the relevant number of integer variables required to represent all possible changeovers in the planning horizon. However, in many real applications, production is planned on a rolling horizon basis, that is, only decisions related to the first period of the planning horizon are usually implemented. Production decisions on later periods are often only represented, because these are obtained using data (forecasted demand) that will change in the next period. Thus, it is not worth spending a lot of time to exactly solve a problem whose input data are imprecise and unstable because to do so would be to exactly solve the wrong problem. This suggests the formulation of simplified models that do not consider the scheduling sequences in later periods. In this paper it is shown that if on one hand demand uncertainty due to forecasting justifies the model simplification (making it senseless to specify the exact future scheduling sequences) then on the other hand it introduces instability issues that can have a considerable impact on the performances of simplified MIP formulations. The study is conducted using data from a real case and simulating both the demand forecasting procedure and the production planning phase on a rolling horizon basis, and gives insights for deciding on the appropriate level of simplification of MIP formulations that can be successfully applied to these problems.

Keywords: Lot sizing; Scheduling; Sequence dependent setup costs; Rolling horizon; Demand forecasting (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527312000655
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:140:y:2012:i:2:p:803-814

DOI: 10.1016/j.ijpe.2012.02.007

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:140:y:2012:i:2:p:803-814